Goodman Shatin Logistics Centre Phase 1 嘉民沙田物流中心第一期
- Industrial Space
- 6 Wong Chuk Yeung Street
- Fo Tan
Goodman Shatin Logistics Centre Phase 1 嘉民沙田物流中心第一期
- Industrial Space
- 6 Wong Chuk Yeung Street
- Fo Tan
Goodman Shatin Logistics Centre Phase 1 嘉民沙田物流中心第一期
- Industrial Space
- 6 Wong Chuk Yeung Street
- Fo Tan
Goodman Shatin Logistics Centre Phase 1 is a 18-storey Logistics Centre located in 6 Wong Chuk Yeung Street. It has 2 passenger lifts and 11 cargo lifts. To comply with the sustainable green practices in improving energy efficiency and environmental management, Goodman Shatin Logistics Centre Phase 1 has achieved BEAM Plus EB V2.0 - Excellent rating.
Goodman Shatin Logistics Centre Phase 1 is a single ownership Logistics Centre with workshop/ offices available for rent.
Usage | Industrial (For Rent) |
---|---|
No. of Storeys |
|
Year Completed | 1987 |
Ownership | Single Landlord |
Typical Floor Area | 15,510 ft² |
Air Conditioning |
|
Management & A/C Fee |
|
Elevator |
|
Slab-to-slab Height | 4.50 (Meter) |
Features | BEAM |
Carpark (Inhouse) | Not Available |
Hotel Nearby |
|
Last Updated | 2024-10-14 |
Ref. | B0012473 |